Manufacturing Center
- The new workshop was designed and constructed in accordance with the Good Manufacturing Practice for Veterinary Drugs (Revised 2020). It passed the expert inspection and acceptance for GMP certification organized by the Ministry of Agriculture and Rural Affairs on August 13 and 14, 2022, and was officially put into production on September 1, 2022.
- The total investment of the new workshop reaches RMB 300 million. It consists of an independent live vaccine workshop, a separate inactivated vaccine workshop, a warehouse area and animal production houses.
| Total Investment | RMB 300 Million | |
|---|---|---|
| Live Vaccine Workshop | Fermentation Line | 1 set of 300L Fermentation System |
| Suspension Culture Line |
1 set of 100L Suspension Culture System 1 set of 50L Microcarrier Suspension Culture System |
|
| Finished Product Line |
1 set of Automatic Washing, Drying, Filling and Feeding System 2 sets of 35 ㎡ Lyophilization and Filling System 1 set of 15 ㎡ Lyophilization and Filling System |
|
| Inactivated Vaccine Workshop | Fermentation Line | 2 sets of 1500L Fermentation Culture System |
| Genetic Engineering Fermentation Line | 2 sets of 2000L Fermentation Culture System | |
| Suspension Culture Line |
1 set of 500L Full Suspension Culture System 2 sets of 2000L Full Suspension Culture System |
|
| Finished Product Line |
1 set of 4-Ton Emulsification System 2 sets of 2-Ton Emulsification System |
|